Home Bathroom refurbishment

A ROOM PLANNED AROUND DAILY LIFE

Bathroom refurbishment
in London

We refurbish and fit bathrooms across London and the M25, bringing together the preparation, plumbing, tiling and finishing work the room needs. Tell us what you want to keep, what needs replacing and how the bathroom is used. We discuss the work before planning the visit or viewing.

LET’S PLAN THE WORK

Share photographs, measurements and the changes you have in mind.

Bathroom fitter checking a new basin unit in a London bathroom
Bathroom specialist measuring an existing room before refurbishment

Start with the room you have.

We begin with the existing bathroom rather than a list of new products. The position of the sanitaryware, the condition of walls and floors, access to services and the space available for working all affect the refurbishment. A compact flat bathroom can need as much thought as a larger family room because every fitting shares a small amount of usable space.

We discuss the changes you want, including which fixtures will remain and which are being replaced. If the layout is changing, we review the implications before work is agreed. We can help with layout planning and material choices, but photographs alone cannot establish the condition of everything concealed behind an old fitting or tiled surface.

A complete renovation and a smaller fitting update need different arrangements. We plan the sequence around the actual work, not a standard package of tasks. Where the project is expected to take more than a day, the published booking conditions require an on-site viewing so the room and proposed work can be assessed.

Hands aligning a bathroom vanity drawer beside a ceramic basin

Sanitaryware, storage and useful details.

We fit bathroom fixtures such as basins, toilets and showers, together with agreed furniture and accessories. Product dimensions, fixing requirements and connections matter as much as the appearance of the fitting. We ask for the details of the items being supplied so we can discuss compatibility with the planned position and the work involved.

A basin unit may combine plumbing, furniture fitting and finishing around the wall or floor. A shower replacement may also affect adjacent tiles and seals. We look at those connections between tasks rather than treating each product as an isolated installation. Any additional work identified during assessment is discussed before it is added to the plan.

We also consider how doors, drawers and screens will move once the room is complete. Clearances need to work with other fittings, the entrance and the way the bathroom is used. Tell us about the storage you need and any awkward features of the existing layout, including tight corners or difficult access beneath a fixture.

Different starting points

Starting pointWork we discussUseful information
A full refurbishmentRemoval, preparation, connections and new finishes.Existing-room photos and the proposed layout.
New bathroom fittingPrepared surfaces, fixtures and agreed services.Plans and the installation details of supplied fittings.
A smaller updateThe selected fixtures, accessories or surfaces.What remains and what needs replacing.
The work is assessed for the bathroom and products involved.
Worker carefully removing an old wall tile in a protected bathroom

Removal with the next stage in mind.

For refurbishment, we agree what will be disconnected, removed, kept or stored for reuse. Old tiles, fittings and damaged boards can affect the preparation that follows. We discuss disposal arrangements as part of the proposed work rather than assume that every removed item is included in the same handling arrangements.

Before removal begins, we review the working area and access route. We protect the immediate area and nearby surfaces as appropriate to the work. In a flat or shared building, the route through communal areas needs planning as well. Please mention lift restrictions, permitted working arrangements and where materials can be delivered or stored.

The condition behind an existing finish may only become clear when it is opened up. We explain what we find and discuss any change to the agreed preparation. We do not cover a problem simply to keep to an earlier outline of the job. Keeping you informed at that point helps decisions about replacement materials and further work remain clear.

The finish depends on what is underneath.

We prepare walls and floors for the finishes being installed. Depending on the room and agreed work, this can include removing damaged material, boarding, patching, plastering and levelling. The required preparation is assessed with the existing construction and the intended finish in mind; it is not identical in every bathroom.

Our tiling service covers wall and floor installation, grouting and agreed sealing work. We consider tile dimensions, layout and the relationship to fixtures before fitting. Corners, edges and the areas around sanitaryware need their own attention so the finished surfaces meet neatly and suit the room.

Painting and decorative work can form part of the refurbishment where required. We discuss which surfaces need treatment and what is being supplied. Different products have their own preparation and drying requirements, which affect the order of work. We explain those considerations when planning the room rather than promise a single completion time for every combination of materials.

Tiler positioning cream floor tiles in a prepared bathroom

Decisions before work begins

DecisionWhat we reviewWhy it matters
Material supplyWho supplies tiles, sanitaryware and furniture.Products have different preparation and fitting requirements.
AccessDeliveries, storage and routes through the building.Bathroom work involves both removal and new materials.
AuthorisationWho can approve changes or additional work.Unexpected conditions need a clear decision route.
Agree these details so materials and trades can be planned together.
Plumber checking a basin connection beneath an open vanity

Plumbing and electrical work in the plan.

Bathroom work can involve more than one trade. We arrange the plumbing needed for agreed fixture connections and the electrical work relevant to fittings such as a fan or towel rail. We discuss those requirements before booking, including what is existing, what is being replaced and whether the proposed position changes the work required.

These tasks have separate published trade rates, so a general handyman rate should not be taken as the rate for every part of a bathroom project. Our plumbing repairs and installations page explains that part of the service. Electrical work is planned with the appropriate specialist rather than added as an ordinary accessory-fitting task.

We need clear information about the products and the property before arranging the work. If a fitting has special installation instructions, include those with the enquiry. Please tell us about known faults or previous repairs. We assess the proposed installation and existing conditions; we do not infer that a new product can simply replace the old one without checking its requirements.

Agree the practical arrangements early.

We work in occupied homes, apartments, rental properties and suitable business premises. Bathroom refurbishment affects a room used every day, so access and the sequence of work need discussion before the appointment. Tell us whether it is the property’s only bathroom and who can answer questions while work is underway.

For rented or managed properties, agree permissions and identify who can approve changes. We need a clear contact for decisions about fittings, materials or additional preparation. In buildings with shared access, explain any restrictions on deliveries, noise or use of a lift. These details help us plan around the property rather than discover an avoidable obstacle on arrival.

We bring tools for the agreed tasks. Material supply and sourcing are separate arrangements, so confirm what you are purchasing and what you want us to obtain. Keeping product information together is useful when several fittings arrive from different suppliers. Please include the following with your initial enquiry so the proposed work can be discussed in a practical way.

  • Photographs and measurements of the existing room
  • The fittings and finishes you intend to keep or replace
  • Product details for new sanitaryware, furniture and accessories
  • Access arrangements, building rules and the person authorised to approve changes
Boxed bathroom fittings organised beside a clear bathroom doorway
Completed bathroom with a sage vanity and neatly finished cream tiles

Check the room as a whole.

We review the completed work with attention to both the individual tasks and the way they meet. That includes the operation and position of agreed fittings, furniture alignment and the finish around adjacent surfaces. We discuss any material-specific drying or setting considerations before the room is put back into ordinary use.

If you are arranging work for someone else, nominate a handover contact before the project begins. That person should know the agreed work and be able to raise questions during the review. A written list of the fittings being installed also helps keep the handover focused on what was requested rather than an assumed package.

Some customers combine refurbishment with mirror fitting, accessory mounting or work in a nearby room. We can discuss those tasks in advance and decide how they fit the sequence. Additional jobs are not automatically included because another trade is already attending. We review the full list and explain any different trade, handling or material requirements before the booking is confirmed.

A price based on the actual project.

The work, the room and the appointment arrangements determine the booking. A bathroom refurbishment can include handyman, plumbing and electrical tasks, with different labour rates. Larger work taking more than a day requires an on-site viewing under the published conditions. We discuss the proposed work rather than present a general hourly figure as a complete bathroom price.

For reference, standard weekday handyman labour, Monday–Friday from 8am–6pm, is £83 for the first hour and £36 for each subsequent half hour, with a one-hour minimum. The published weekday first-hour rate for plumbers and electricians is £110. Weekend and out-of-hours charges differ. The full price list and conditions should be checked for the applicable trade and appointment time.

Labour prices include taxes, while materials and additional expenses are separate. Agreed material sourcing is charged at £49 per hour for a handyman or £52 per hour for plumbers and electricians, plus the materials themselves. Parking is added if incurred; congestion charges may apply when scooter attendance is not possible. The published cancellation or rearrangement policy asks for at least 48 hours’ notice.

What contributes to the booking

FactorWhat changes the workPricing basis
PreparationCondition beneath existing tiles or fittings.The agreed preparation and any further work identified.
TradesPlumbing, electrical and fitting requirements.The relevant published trade rates.
FinishesTile layout, decorative work and accessories.The work and materials agreed for the room.
These factors are discussed before the project is arranged.

BEFORE YOU ARRANGE THE VISIT

A few practical answers.

Can you keep some of my existing bathroom fittings?

We can discuss retaining or reinstalling suitable items. Tell us what you want to keep and send photographs. Their condition, connections and compatibility with the proposed layout need assessment before we include reuse in the plan.

Do you offer help with bathroom layout?

We can assist with layout planning and material choices. We review the room, the fittings and how the bathroom will be used. Changes to positions may affect plumbing, electrical work and preparation, so those implications are discussed before booking.

How long will the refurbishment take?

The duration depends on removal, preparation, the fittings and the materials involved. We assess the proposed work and explain the expected sequence. We do not attach one standard completion time to every bathroom or promise that products share the same drying requirements.

Can I supply the tiles and sanitaryware myself?

Yes, discuss the proposed products with us before ordering or booking. We need the relevant dimensions and fitting instructions. Confirm the delivery arrangements and which materials are included so missing or unsuitable products do not disrupt the planned work.

Can you refurbish a bathroom in a rented property?

We work with tenants, landlords and property managers. Obtain the necessary permission and nominate someone who can approve decisions about fittings or additional preparation. Building access, deliveries and any working restrictions also need to be explained in advance.

Will plumbing and electrical work use the same rate?

No. The published price list has separate rates for handymen, plumbers and electricians. A refurbishment may involve several types of work. We discuss which trades are required and the applicable rates rather than treat the whole project as one ordinary handyman task.

TELL US WHAT NEEDS DOING

Let’s plan
your visit.

Send your postcode, photographs and the full job list. We’ll discuss the work and the relevant booking arrangements.

0203 404 5950